Case Studies

0

Greater Nottingham LIFT

posted in

Health

SGW were employed by the Greater Nottinghamshire NHS to oversee the specification and installation of security, surveillance and access systems throughout the LIFT development programme.

1

North Nottingham LIFT

posted in

Health

The main contractor for the North Nottinghamshire NHS LIFT projects requested that SGW provide an executive summary of opinion regarding the suitability of electronic security systems provision for the proposed new buildings.  

2

NUHNHST - ANPR

posted in

Health

SGW produced a feasibility study on the implementation of an ANPR system to enable Pay and Display parking areas to be monitored and controlled. This included customer requirements gathering and the production of a draft report detailing high level design and cost options.

1

NUHNHST - New Control Room

posted in

Health

Nottingham University Hospitals NHS Trust engaged SGW to specify, procure and project deliver a technical solution and building requirements for trust-wide CCTV and access control to be controlled from a single location.